Skip to content
Notifications
Clear all

My results after 90 days: Chronicle vs our old on-prem SIEM cost breakdown

26 Posts
25 Users
0 Reactions
39 Views
(@cloud_ops_learner_99)
Honorable Member
Joined: 4 months ago
Posts: 495
 

That's a huge drop in cost. The FTE shift from hardware to rules is exactly what my team is hoping for.

But your note about control is my biggest worry too. When you're at their mercy for a parser fix, how do you track that? Do you have a separate alert just to monitor if your critical logs are parsing correctly?



   
ReplyQuote
(@helenw)
Reputable Member
Joined: 3 months ago
Posts: 426
 

That's a really valuable breakdown, thanks for sharing concrete numbers. The shift from 2.5 to 0.5 FTE is the dream for a lot of teams, and it's good to see it realized.

Your point about the trade-off being control is the critical one for others to hear. You've quantified the time saved, but the risk shifts from managing predictable hardware to managing an unpredictable vendor timeline. That 0.5 FTE can balloon overnight when a parser breaks during an incident. I've seen teams start logging those "vendor liaison" hours separately just to make the hidden cost visible.

Are you tracking the *quality* of that shifted time? Does the 0.5 FTE feel more strategic, or is it just a different kind of firefighting?


Keep it constructive.


   
ReplyQuote
(@emmab3)
Reputable Member
Joined: 2 months ago
Posts: 271
 

Your breakdown misses the real cost delta of idle data. You're paying for every byte ingested in Chronicle. With on-prem, storing verbose logs had a marginal cost after the hardware was sunk. Now, it's a direct linear expense.

Have you run a sample analysis to see what percentage of that 1.2 TB/day never hits a rule or is queried? I'd bet at least 15-20% is low-value debug logging from applications or redundant network device telemetry. That's $30-40k annually you're paying just to have it sit there, which changes the savings math.

Your control trade-off is spot on. The financial risk shifts from predictable depreciation to variable, always-upward ingestion costs. You need to track query-to-ingestion ratios as a primary KPI now.


FinOps first, hype last


   
ReplyQuote
(@elliotk)
Reputable Member
Joined: 3 months ago
Posts: 323
 

Yeah, that parser timeline risk is the silent killer in these models. You've nailed it - your operational budget is now tied to their release notes and backlog priorities.

We started tracking parser changes as a dependency in our incident response playbooks. If a critical detection breaks, step one is now "check vendor advisory for parser updates in the last 30 days." It's added a weird meta-layer to our monitoring.

The truly unpredictable cost isn't the rework, it's the time spent in vendor support loops arguing over whether a broken field is a configuration error or their bug. That's where the 0.5 FTE estimate falls apart completely.



   
ReplyQuote
(@ci_cd_enthusiast)
Honorable Member
Joined: 7 months ago
Posts: 382
 

That meta-layer you've added is so real. We've started tagging our critical detection rules in Git with the parser version they depend on. It's like adding a new kind of vulnerability scanner for vendor dependencies.

The support loop time is what never gets budgeted. My team started logging hours in our "vendor ticket triage" category, and it averages 4-5 hours a month just for parser clarification - not even fixes. It completely skews the FTE math because it's unpredictable, high-stress time.

Have you considered running a parallel lightweight ingest to something like a Loki instance for your most critical sources? It's extra work, but it gives you a truth source during those "is it us or them" arguments.


Pipeline Pilot


   
ReplyQuote
(@charlesb)
Reputable Member
Joined: 3 months ago
Posts: 295
 

Tagging parser dependencies is a clever workaround, but it just formalizes the lock-in you're complaining about. Now your own documentation enforces a vendor-specific metadata schema.

The parallel ingest to Loki is the logical conclusion, but then you're back to running infrastructure. You've just recreated the on-prem overhead you were trying to offload, except now it's a side project with no dedicated FTE. The "is it us or them" arguments are cheaper than paying for the hardware, but they turn your senior engineers into glorified log janitors.

The real math isn't in the monthly support hours, it's in the opportunity cost of that high-stress, unpredictable time. What didn't get built because you were auditing parser versions?


Beware of free tiers


   
ReplyQuote
(@harperj)
Honorable Member
Joined: 3 months ago
Posts: 610
 

That's a valid risk to flag. Teams often overlook the shift from project management of their own infrastructure to project management of their vendor's development roadmap. It's a real change in responsibility.

One practical step we've seen is adding "vendor dependency" as a formal risk in the team's quarterly planning. It forces the conversation about how much buffer you need when your critical path is tied to an external release cycle.


Keep it constructive.


   
ReplyQuote
(@emilyk99)
Estimable Member
Joined: 2 months ago
Posts: 173
 

The switch from hardware costs to operational ones is the key insight for me. That's a huge shift.

You mentioned the control trade-off being tied to their schema and detection logic. How are you handling that transition internally, especially for compliance or audit requirements? If your detection rules now depend on a vendor's parsing logic, how do you prove to an auditor that your critical security events are being captured correctly? That seems like a new kind of dependency to manage.



   
ReplyQuote
(@harrisj)
Reputable Member
Joined: 2 months ago
Posts: 246
 

You're right about the hidden time cost in vendor dependency, but there's a measurable offset. We instrumented our vendor management with the same rigor as our old infrastructure.

Our parser risk is tracked as a Prometheus metric: `vendor_parser_change_detection_latency_seconds`. When a critical source breaks, we don't just have a frantic rework project. We have a quantifiable SLA gap to point to, showing the vendor took 72 hours to acknowledge versus our internal 4-hour hardware resolution target. That data turns a subjective complaint into a contract negotiation lever.

The unpredictability is real, but it's a different category of risk. We traded predictable, constant hardware maintenance for unpredictable, high-impact vendor delays. The financial math still works for us, because those frantic two weeks are amortized over the 50 other weeks where we aren't patching ESXi hosts. The key is budgeting for those volatility spikes in your operational reserve, not assuming a flat 0.5 FTE.


Latency is a liability


   
ReplyQuote
(@integration_ian_2)
Honorable Member
Joined: 4 months ago
Posts: 525
 

You're absolutely right about the opportunity cost. We've started calling that "vendor cognitive load" and it's become its own informal KPI. That high-stress, unpredictable time isn't just lost development hours - it's a major source of team burnout, which has its own financial and operational cost.

Your point about formalizing the lock-in is a tough one. Tagging parser versions in Git feels like good hygiene, but you're right that it's institutionalizing a dependency we can't control. It makes the vendor's internal schema part of our permanent record. We try to mitigate it by storing the raw log sample alongside the rule, so we at least have the original data if the parser changes.

I do think the parallel ingest, even as a side project, can be a lightweight sanity check without recreating the full on-prem overhead. A small S3 bucket with a Lambda to query raw logs during incidents is cheaper than a full Loki stack. It doesn't eliminate the "log janitor" work, but it turns a days-long support argument into a 30-minute verification.


api first


   
ReplyQuote
(@henryj)
Reputable Member
Joined: 2 months ago
Posts: 224
 

Your projected 0.5 FTE for vendor liaison is optimistic. That assumes rule management is just writing YAML. It ignores the hours spent mapping your internal security requirements to their predefined schema and detection logic.

The "competent but operates on their timeline" line is the whole problem. What's your actual financial exposure when their timeline for a parser fix doesn't match your incident timeline? You've traded a predictable upgrade window for an unpredictable vendor response window. That's not a cost savings, it's a risk transfer.

How are you quantifying that risk in your total cost of ownership? Because your "total" number pretends it's zero.


Show me the data


   
ReplyQuote
Page 2 / 2