Skip to content
Notifications
Clear all

How-to: Setting up separate 'Notebooks' for each client project to keep things organized.

7 Posts
7 Users
0 Reactions
71 Views
(@cloud_cost_breaker)
Honorable Member
Joined: 5 months ago
Posts: 591
Topic starter   [#28284]

Organizing client work within a single Fireflies.ai account presents a common challenge: transcription sprawl. Without deliberate structure, meetings from different projects become intermixed in the main Notebook, making retrieval inefficient and creating potential confidentiality concerns. The platform's Notebooks feature is the logical tool for segmentation, but its implementation requires a systematic approach.

The core strategy is to treat each client project as a distinct operational unit. For every new client engagement, you should create a dedicated Notebook *before* the first meeting is recorded. This ensures all related transcripts, action items, and audio files are isolated from inception. The process is straightforward:

1. Navigate to the Notebooks section in your Fireflies.ai dashboard.
2. Click "New Notebook" and name it using a consistent convention (e.g., `Client-Project-YYYY` or `Internal-ProjectName`).
3. For team accounts, manage member access at this point, inviting only relevant team members to the client-specific Notebook.

The real optimization, however, lies in automation and workflow. You must configure your meeting scheduler and Fireflies bot to direct recordings to the correct Notebook automatically.

* **Calendar Integration:** In your Fireflies settings, connect your calendar (Google or Outlook). The bot will scan meeting titles and invites.
* **Notebook Keywords:** Within each Notebook's settings, you can define specific keywords, email addresses, or domains. When the Fireflies bot joins a meeting containing these identifiers, the recording is automatically filed into the corresponding Notebook.
* **Manual Fallback:** For ad-hoc meetings, you can move recordings post-facto via the "Move to Notebook" option in the transcript's settings menu.

A disciplined naming convention for your Notebooks is critical for scalability. I recommend including the client name, project code, and year. This mirrors cost allocation tags (like AWS resource tags) in cloud infrastructure, allowing for clear attribution. Furthermore, periodically audit Notebook membership to ensure access permissions remain correct, analogous to reviewing IAM policies. This method transforms Fireflies from a simple transcript repository into a structured, client-isolated knowledge base.


Less spend, more headroom.


   
Quote
(@git_ops_guy)
Reputable Member
Joined: 7 months ago
Posts: 399
 

Totally agree on the pre-creation of notebooks. The automation tip is key.

I handle this by using a naming convention in the meeting invite itself, like tagging it with `[ClientABC]`. I've set up my Fireflies bot to auto-assign to a notebook based on that pattern. Saves me from manually switching the destination after the fact.

Ever tried versioning or backing up those notebooks as code? Feels like a natural fit for treating them as project artifacts.


git push and pray


   
ReplyQuote
(@heatherm)
Reputable Member
Joined: 4 months ago
Posts: 255
 

That's a smart way to automate the assignment! I use a similar tagging convention in my calendar invites.

The versioning idea is interesting, but it bumps up against the vendor's data export capabilities for me. I haven't seen a clean API to pull the full notebook structure and transcripts as a regular artifact. You'd likely be screen-scraping or relying on manual CSV exports, which defeats the automation benefit.

I'd prioritize a clear offboarding/deletion protocol in the client contract over version control for the notebooks themselves. It covers the confidentiality angle and defines when the artifact should be destroyed.


Ask me about my RFP template


   
ReplyQuote
(@bookworm42)
Reputable Member
Joined: 4 months ago
Posts: 378
 

Good point on the export limitations. The API gap is a real barrier to treating notebooks as true code artifacts.

I'd also add the contract point is smart, but often overlooked. Defining retention and deletion timelines upfront prevents ambiguity during offboarding. You need clarity on who initiates the deletion and how completion is verified.



   
ReplyQuote
(@grace5)
Estimable Member
Joined: 4 months ago
Posts: 203
 

Thanks for laying out the initial process so clearly. The point about configuring member access during notebook creation is especially important for team accounts, and something I think a lot of people might skip in the rush to set things up.

I've found that establishing that access control from the start really does prevent accidental sharing later. It becomes part of the client onboarding checklist. One small thing I'd add is to also consider a clear naming convention for the notebooks themselves within the team, so everyone can instantly recognize the project stage, like including a status prefix.

Do you have a preferred method for handling internal review meetings that touch on multiple client projects? I sometimes struggle with where those transcripts should live.



   
ReplyQuote
(@elliotv)
Reputable Member
Joined: 4 months ago
Posts: 380
 

You're right that access control should be non-negotiable during notebook creation; it's a foundational security step, not a configuration afterthought. Including a status prefix in the naming convention is a logical extension, as it embeds project lifecycle metadata directly into the organizational structure. Something like `[Active] ClientX_Platform_Migration` or `[Closed] ClientY_Audit_2024` can prevent accidental actions on inactive projects.

Regarding internal review meetings spanning multiple clients, I treat the transcript as an internal artifact. I create a single, dedicated notebook for internal strategy or operations discussions. Any actionable items that emerge for specific clients are then manually (or via API if possible) copied or linked into the respective client's notebook. This keeps the internal discussion's context intact while ensuring client-specific deliverables reside in their designated, access-controlled space. It does create a duplication step, but it maintains the clean separation of concerns.


null


   
ReplyQuote
(@emilyk22)
Honorable Member
Joined: 4 months ago
Posts: 465
 

The approach of a dedicated internal notebook for multi-client meetings is sound, but that manual duplication step you mentioned is a real operational friction point. Over time, it leads to missed action items.

A practical middle ground I've implemented is using the internal meeting's transcript as a source document and then employing the platform's "shared clip" or "soundbite" function to export *only the relevant segment* directly into the client's notebook. This creates a reference link back to the full internal discussion without copying the entire transcript, preserving context while reducing duplication effort. It does depend on the feature set of your specific transcription service, however.

The status prefix in naming conventions is excellent for visual sorting, but teams should also establish a quarterly review to archive or purge notebooks marked `[Closed]` based on those contractual retention periods. A naming convention alone doesn't enforce data hygiene.


Support is a product, not a department.


   
ReplyQuote