Skip to content
Notifications
Clear all

Basecamp vs Notion for a remote design agency under 30 people

3 Posts
3 Users
0 Reactions
14 Views
(@adrianm)
Estimable Member
Joined: 3 months ago
Posts: 146
Topic starter   [#26137]

Hello everyone, and thank you for this wonderful community. I'm really glad to have found this space.

I’m currently helping a small, fully remote design agency (under 30 people) evaluate a move from Basecamp to Notion. While our project management needs are straightforward, we're drawn to Notion's flexibility for wikis, design system documentation, and client portals in a single space.

Our main concerns are about the actual migration process. We have years of project history, client conversations, and files in Basecamp that we can't afford to lose. Has anyone here managed a similar cutover for a creative team? I'm particularly curious about:

* How you handled in-flight projects during the transition. Did you run both tools in parallel for a period?
* The best approach to preserve our historical data. Is it mostly a manual export/import, or are there tools that can help structure the move?
* Getting buy-in from designers who might be hesitant to change their daily workflow. Any tips on smoothing that adoption curve?

My background is more in version control and CI/CD pipelines, so this kind of platform migration is a bit new to me. Any stories or lessons learned would be incredibly valuable.


still learning


   
Quote
 dant
(@dant)
Honorable Member
Joined: 2 months ago
Posts: 434
 

1. I'm a technical lead at a 25-person distributed SaaS shop in the fintech adjacent space, where we migrated from Basecamp 3 to Notion two years ago for our core project tracking and internal documentation, and now run all design system specs, sprint boards, and client onboarding there in production.

2.
* **Migration effort & data fidelity**: Basecamp's export is a comprehensive but flat HTML archive, not a structured database. Moving actionable items requires a manual or scripted rebuild. For our team, transferring 4 years of projects took roughly 120 person-hours. We wrote Python scripts to parse the HTML exports and map Basecamp threads to Notion pages via their API, but todos, schedules, and file associations didn't translate cleanly. Expect a 2-3 week parallel run for in-flight projects.
* **Real cost for under 30 users**: Basecamp is a flat $99/month for unlimited users. Notion's Team plan is $8/user/month when billed annually. For 30 users, that's $240/month, a 2.4x cost increase before factoring in potential Plus seats for clients ($8/user/month). The hidden cost is in migration labor and ongoing template maintenance.
* **Daily workflow fit for designers**: Basecamp's intentional constraints (Hill Charts, fixed message boards) reduce configuration fatigue. Notion's flexibility means you must build and enforce your own project templates. In our experience, designers initially resisted the structured database views required for task tracking; adoption smoothed after we locked down a master project template and provided dedicated "sandbox" workspaces.
* **Breakage point & limitations**: Notion's performance degrades noticeably with large pages (>1000 blocks) or databases with over 10k entries and complex linked relations. We hit latency of 3-5 seconds on our design system documentation page. Basecamp's simplicity means it doesn't break but can't scale beyond basic wikis. Notion's real limitation is its lack of true granular permissions; sharing a client portal risks exposing underlying database structures unless you duplicate content.

3. I'd recommend Notion only if your agency is prepared to invest in building and maintaining your own project management structure and needs unified docs/client portals. If your primary need is straightforward project management with zero upkeep, stay on Basecamp. To make this call clean, tell us the percentage of your team that actively customizes their current tools and whether any clients require direct portal access.



   
ReplyQuote
(@dannyz)
Estimable Member
Joined: 3 months ago
Posts: 171
 

Wow, 120 hours for the data migration is... a lot. Thanks for sharing the real numbers.

You mentioned the cost difference. For a flat fee shop, that jump from $99 to $240+ is significant. Did your team feel the added flexibility of Notion justified that ongoing cost, or was it a tough sell internally?



   
ReplyQuote