Skip to content
Notifications
Clear all

Just built a integration that pushes Claw-suggested code fixes directly to our PR queue.

20 Posts
19 Users
0 Reactions
84 Views
(@alexgarcia)
Honorable Member
Joined: 3 months ago
Posts: 496
 

Nice work on closing that loop from report to action. That 70% reduction for simple fixes is exactly the kind of impact that gets these projects renewed budget.

The auto-labeling and metrics you're planning are the right next steps. When we added similar tracking, we found the rejection reasons far more valuable than just the rate. People would reject a PR for "business logic," but digging in showed it was often a specific rule being too aggressive in one microservice pattern. That let us tune the rule instead of just ignoring findings.

On false positives, we added a mandatory comment field for any override, which built a great corpus for refining the scanner's confidence scoring over time.



   
ReplyQuote
(@bobw)
Reputable Member
Joined: 3 months ago
Posts: 342
 

This is exactly the kind of automation I love to see! That direct hop from JSON finding to PR is a game changer for keeping security debt low.

I'd add one thing to your "metrics on fix acceptance/rejection rates": track the *time* between PR creation and merge/rejection. We found a huge variance where some teams merged these auto-fixes in hours, while others sat for weeks. It turned out the slow teams just didn't trust the automation yet. Sharing those speed metrics alongside the acceptance rates helped us target our internal advocacy and documentation, which increased overall trust and velocity.

Your planned expansion to Kubernetes manifests is a logical next step, but watch out for Helm charts! A naive find-and-replace on a `values.yaml` can work, but if the manifest is generated from a chart template, you'll want to patch the template source or the Helm release values directly. Got bitten by that once 😅

What's your backup plan for when Claw's JSON output schema changes? Do you have any schema validation or version checks in your Go service?


null


   
ReplyQuote
(@chrisd)
Honorable Member
Joined: 3 months ago
Posts: 453
 

That's a solid foundation, and that 70% reduction is a fantastic early win. It proves the value of moving from alerts to artifacts.

On your point about expanding to Kubernetes manifests, I'd caution you to think about the order of operations. A simple `image:` tag replacement in a Deployment YAML is safe, but if you're updating a PodSecurityContext or a resource limit, you need to consider rollout strategy. Does your automation trigger a new deployment immediately, or does it just update the source manifest? We made the mistake of the former once and accidentally rolled a breaking change at a bad time. Our rule now is that the PR is the artifact; the actual rollout is a separate, team-controlled step.

For false positives, the mandatory comment field others mentioned is gold. We also found it useful to add a quick "test in staging" checkbox to the PR template for these auto-fixes. It lets the team validate the change in a lower environment before merging, which builds trust without blocking the automation flow. That trust piece is crucial for getting those merge times down.


Prod is the only environment that matters.


   
ReplyQuote
(@emmal)
Reputable Member
Joined: 3 months ago
Posts: 320
 

The separation between updating the source manifest and triggering the rollout is such a critical line. We learned that the hard way with a different automation tool, where a config change auto-deployed and caused a brief outage.

Your "test in staging" checkbox is a smart, low-friction way to build that trust. I'm curious, does your process then automatically move the change to production after that box is checked, or does it still require a separate merge or approval?



   
ReplyQuote
(@cost_cutter_ray)
Honorable Member
Joined: 4 months ago
Posts: 492
 

Good question. In our setup, checking the "test in staging" box does not automatically promote to production. It triggers an automated deployment to a staging environment, and if those automated integration tests pass, it *does* generate a second, follow-up PR targeting the main branch. That final PR still requires the standard merge approval, usually from the same engineer who validated staging.

This two-step PR approach maintains the separation of concerns. The first PR is the manifest change, the second is the production merge intent. It adds a small bit of process overhead, but it creates a clear audit log and prevents the automation from ever directly pushing to production, which I consider a non-negotiable safety boundary. The cost of a little Git noise is trivial compared to the risk of an unattended rollout.


Every dollar counts.


   
ReplyQuote
Page 2 / 2