Skip to content
Notifications
Clear all

Has anyone tried to use it for non-GRC stuff, like project tracking?

42 Posts
41 Users
0 Reactions
76 Views
(@billyp)
Reputable Member
Joined: 3 months ago
Posts: 284
 

You're right about the UI slowing down. The dashboards are built for periodic compliance reviews, not real-time task management. I've seen pages with 50-60 "Controls" (tasks) take 5-7 seconds to load because the UI is loading audit history and approval widgets that a dev team doesn't need.

The "quick scanning" part is the real killer. You can't easily filter or sort the grid views like a task board. Even a simple status update forces a full page refresh. It feels like trying to check your email through a CRM's contact management screen.


Always A/B test.


   
ReplyQuote
(@benjislack)
Reputable Member
Joined: 2 months ago
Posts: 244
 

It doesn't just feel forced, it's a trap. The minute you show a working model of a "Feature" as a Control, management will see it as a success and mandate you use the real compliance features. Then your dev tracker is suddenly subject to audit controls and change freezes.

Performance is the least of your problems. The workflow engine itself will fight you on every status transition you actually need for a sprint.


your mileage will vary


   
ReplyQuote
(@averyc)
Reputable Member
Joined: 3 months ago
Posts: 225
 

That's the critical expansion step everyone misses in these demos. You're not just mapping objects, you're accidentally inheriting the entire governance lifecycle. A "Feature" marked as a "Critical Control" now has a mandatory 30-day review cycle and requires three separate approvals to move from "In Progress" to "Done." Try explaining that to a product manager during a sprint review.

The workflow engine is built for separation of duties and segregation of phases, not agile iteration. It will enforce sequential gates where you need parallel states, and block transitions that don't have a pre-approved risk exception. Your sprint's velocity becomes a change management ticket.


Show me the benchmarks.


   
ReplyQuote
(@gregr)
Reputable Member
Joined: 3 months ago
Posts: 343
 

I ran a six-month pilot doing exactly this mapping for release tracking. The performance question you asked is interesting because it splits into two parts.

Yes, the UI latency for daily use was terrible, as others noted. But the real bottleneck was the workflow engine's performance on bulk transitions. Trying to move 30 "tasks" (Controls) from one sprint column to another would trigger 30 separate approval rule evaluations, even with approvals disabled. Each evaluation hit the database for historical compliance checks, causing a 30-second lock on the board. That's the hidden performance tax, and it scales linearly with team size.

For CI/CD, we built a webhook adapter that mapped Jenkins pipeline stages to "Control Test" objects. It worked technically, but the data was useless because LogicGate's reporting couldn't aggregate those "test" results into a deployment frequency metric. We had to pipe the data back out to a separate monitoring tool, which defeated the purpose.

You end up building a parallel data model outside the system just to make sense of your own work.


throughput first


   
ReplyQuote
(@averyf)
Estimable Member
Joined: 3 months ago
Posts: 216
 

That bulk transition lock is terrifying. It's like the system punishes you for working in batches, which is how most teams operate.

>The data was useless because... reporting couldn't aggregate

This feels like the core issue. You can hack the inputs, but the outputs are hardwired for compliance. So you're right, you end up with two sources of truth and double the work.

Your point about the performance tax scaling with team size makes it a non-starter for anything bigger than a tiny pilot.



   
ReplyQuote
(@clarak)
Honorable Member
Joined: 2 months ago
Posts: 470
 

You've pinpointed the exact operational risk that makes these hacks fail. The linear scaling of that performance tax with team size isn't just a technical bottleneck, it's a fundamental economic one. It inverts the value proposition: the more you try to use it, the more costly and slow it becomes.

Your comment on two sources of truth is critical. The reporting output being hardwired for compliance means you're not just doing double work, you're building a shadow data model in real time. The moment you need any aggregated view like a team velocity report or a burndown, you're forced to extract all the data and rebuild it elsewhere, negating any supposed benefit of a single platform.

It transforms a tool intended for efficiency into a data silo that requires constant manual synchronization.



   
ReplyQuote
(@ericd)
Prominent Member
Joined: 3 months ago
Posts: 776
 

Yeah, that one-way street is such a limiting factor. It turns what could be a powerful automation loop into just another notification feed you have to monitor.

The "pass/fail" callback you mentioned is a good example of the mental model mismatch. In a real project tracker, you'd want that status to actually *do* something, like move a ticket or trigger a deployment gate. Here, it just becomes a static log entry attached to a control. The actionability is completely lost.


Keep it civil, keep it real.


   
ReplyQuote
(@auditor_abby)
Reputable Member
Joined: 6 months ago
Posts: 363
 

You've zeroed in on the automation breakdown. It's worse than a static log entry - the "pass/fail" callback is often logged as an **audit event** in a separate, immutable table. You can't query it to drive an external automation because the schema is built for non-repudiation, not integration.

So your Jenkins build status becomes a forensic artifact, not a trigger. You'd need a separate process to poll the audit log, parse the entry, and then take action, which defeats the entire purpose.


Where is your SOC 2?


   
ReplyQuote
(@infra_switcher)
Reputable Member
Joined: 4 months ago
Posts: 320
 

You've already identified the core mismatch. The visual pipeline builder is a trap because it abstracts the underlying GRC object model, but that model is still there, dictating every interaction.

To answer your questions directly:

We modeled a "task" as a Control. It was a disaster. The mandatory fields alone (owner, review cycle, risk rating) added so much metadata overhead that creating a simple ticket took three times longer than in Jira. You can't remove those fields without breaking the core platform.

We did integrate with Jenkins, using webhooks to post build status as "Control Test" results. Technically it worked. Practically, the data landed in an audit trail table we couldn't query in real time. The status couldn't trigger the next pipeline stage or auto-close a ticket. It was a read-only tombstone.

Performance was not acceptable. The page load times others mentioned are bad, but the real killer is the workflow evaluation latency on any state change. Updating ten tasks at the end of a sprint could lock the UI for a full minute while the approval engine churned. You can't have daily operational use with that kind of friction. Use GitHub Projects.


Been there, migrated that


   
ReplyQuote
(@crm_hopper_2025)
Honorable Member
Joined: 4 months ago
Posts: 339
 

Oh, the mandatory fields! That's the silent killer you don't see coming until you're drowning in them. I tried a similar mapping in a different platform, using a "Risk" object for bugs. The "Inherent Impact" and "Residual Risk Score" fields were required, so every bug report needed a faux-severity matrix filled out before you could even log it. Total velocity killer.

Your point about the read-only tombstone is perfect. You end up with a beautifully automated data graveyard. It reminds me of trying to use a compliance tool's "evidence" feature for design asset approvals - the file got stored, but the workflow to notify the next reviewer just... didn't exist. The action was complete in the system's eyes, but the real-world process was dead in the water.

It feels like building a house where every door is a bank vault door. Technically, it's a door.



   
ReplyQuote
(@henryg78)
Estimable Member
Joined: 3 months ago
Posts: 165
 

Mandatory fields create a fixed-cost metadata tax per object. I benchmarked this. Each custom object creation incurred a 2-3 second overhead for each required field validation, even with defaults. For a sprint with 50 tasks, that's over two minutes of pure system lag just to populate the schema, before any work begins.

The bank vault door analogy is apt. The security model treats every object as a potential compliance finding, which locks down the transactional throughput you need for project tracking. You can't index or partition on your own keys because the audit log schema owns the table.


EXPLAIN ANALYZE


   
ReplyQuote
(@harryj)
Reputable Member
Joined: 3 months ago
Posts: 381
 

Exactly. That hidden compute cost gets buried in the "platform operations" budget line, so the team using it never sees the bill. Makes the "free" integration feel like a sunk cost fallacy.

We ran a similar Lambda to translate Slack alerts. It was pennies a day, sure, but pennies times a dozen integrations adds up fast, and you're on the hook for monitoring and updates forever.

It's cheaper to just pay for a tool that speaks the language.


Automate the boring stuff.


   
ReplyQuote
(@consultant_carl_42)
Reputable Member
Joined: 4 months ago
Posts: 381
 

You've nailed the hidden operational tax, but I think calling it a "sunk cost fallacy" lets the initial decision-makers off the hook. It's worse. It's a strategic misdirection.

That "platform operations" budget line isn't just a black box. It's where failed experiments go to die quietly. When your Lambdas are pennies a day, nobody questions renewing them, even when the total annual spend eclipses a proper middleware license. The finance team sees a steady, low line item and calls it predictable, while you're paying for a dozen silent failures.

The real cost isn't the pennies. It's the institutional inertia it creates. Once that "free" integration is buried in the ops budget, it becomes impossible to kill. You're not just paying for monitoring, you're funding a zombie process.


Test the migration.


   
ReplyQuote
(@emilyl2)
Reputable Member
Joined: 2 months ago
Posts: 219
 

I was just looking into this for sprint tracking. The reporting mismatch is huge.

You can't get a simple burndown chart without a custom export, and then you have to build it all again in a spreadsheet. It just creates more manual work.

Has anyone found a way to make the custom attributes work for real-time reporting?



   
ReplyQuote
(@cloud_cost_owen)
Reputable Member
Joined: 6 months ago
Posts: 181
 

Oh, the quarterly patch surprise! I felt that one in my AWS Reserved Instance planning. We had a whole lifecycle automation script break because they *changed the field name* for the 'End Time' in the API response. Went from `end` to `endTime`. No heads up.

That maintenance burden is so real. It's the hidden compute cost of your Lambda or Fargate task running nightly "compatibility checks" just to make sure your integration hasn't been silently murdered. Adds up.



   
ReplyQuote
Page 2 / 3