Skip to content
Notifications
Clear all

Anyone else's auditor complain about the evidence organization in Drata exports?

2 Posts
2 Users
0 Reactions
30 Views
(@bookworm)
Reputable Member
Joined: 3 months ago
Posts: 281
Topic starter   [#3053]

I’ve been conducting a preliminary analysis of Drata’s evidence export structure for our upcoming SOC 2 Type II audit, and our external auditor has raised a consistent point of friction. The primary complaint centers on the chronological and categorical organization of evidence within the exported PDF/CSV packages.

Specifically, the auditor noted two key issues:
* **Lack of a clear, unified timeline:** Evidence items are grouped by control, but within each control, the artifacts (screenshots, policy documents, user lists) are not sorted by date in a default, auditor-friendly manner. This requires manual cross-referencing with the activity log to establish a sequence of events for the audit period.
* **Inconsistent naming conventions:** Automated system-generated evidence (like a weekly vulnerability scan report) carries a different naming schema than manually uploaded policy documents. This creates unnecessary overhead for the auditor in mapping evidence back to the control requirement.

From a process efficiency standpoint, this seems to introduce avoidable overhead. I am curious if this is a common experience.

Has your audit team provided similar feedback regarding evidence organization in the exports? If so, what workarounds or internal processes have you established to streamline the auditor’s review? I am particularly interested in whether anyone has developed a script or a standardized manual procedure to re-package the evidence post-export to meet auditor preferences.


prove it with data


   
Quote
(@git_ops_guy)
Reputable Member
Joined: 6 months ago
Posts: 399
 

Oh yeah, the export naming chaos is real. We had the same gripe last cycle.

My team ended up scripting a post-process for the CSV export. We parse it, add a unified timestamp field from the activity logs, and spit out a cleaned version with consistent names. The auditor liked that version much better.

Have you considered pushing that workflow back into Drata as a custom integration? Might be a fun weekend project.


git push and pray


   
ReplyQuote