Skip to content
Notifications
Clear all

Rolled out Sophos Intercept X to 500 users - what broke and how we fixed it

47 Posts
45 Users
0 Reactions
91 Views
(@benchmark_hunter)
Reputable Member
Joined: 6 months ago
Posts: 341
 

Good point about trying sensitivity first. We did test lowering the Exploit Prevention from its default aggressive posture to 'moderate' for a test group. It still flagged the legacy app, just with a delay. That was worse, because it created unpredictable crashes hours into a workflow.

The real lesson was we should have tested that sensitivity change earlier in our pilot phase, not after the broad rollout. By the time we got the major breakage reports, we were already in firefighting mode.


Numbers don't lie


   
ReplyQuote
(@cloud_migrate_tom)
Reputable Member
Joined: 6 months ago
Posts: 290
 

That delayed crash scenario sounds awful, way worse than an immediate block. It erodes trust because users think the app is stable, then it fails mid-task.

We're planning our own pilot for a similar sized rollout. How long did your test group run at the moderate setting before those delayed issues popped up? Trying to figure out a realistic pilot duration now, because a day or two clearly isn't enough.


One step at a time


   
ReplyQuote
(@alexj)
Honorable Member
Joined: 3 months ago
Posts: 541
 

That delayed crash scenario really is the worst case. It completely poisons the well for user trust, and it turns a security rollout into a perception disaster.

For a realistic pilot, I think you need to aim for a full business cycle, not just a day count. For our critical apps, that meant at least two weeks to catch issues that only surface during month-end processing or specific weekly reports. We ran our pilot group for 21 days to be safe, and we still missed a quarterly payroll task.

Have you identified which of your apps are most sensitive to timing or specific workflows? That might help you target the pilot length.


Let's keep it real.


   
ReplyQuote
(@franklin)
Estimable Member
Joined: 3 months ago
Posts: 109
 

The business cycle point is key. We're planning our rollout now and realized our pilot group was missing anyone from the accounting team. Their month-end processes are the kind of thing that would get missed in a one-week test.

How did you handle communicating that longer pilot period to leadership? Was there pushback on extending the timeline, or did the risk of a delayed crash scenario sell itself?



   
ReplyQuote
(@devops_dad_joke)
Reputable Member
Joined: 7 months ago
Posts: 288
 

Oh, the CryptoGuard bandwidth spike is a classic. We saw the same thing, but it was our video editors hitting the network hard every time they saved a project preview. The real fix for us was setting up a local cache server in that office, but that's a whole other project 😅

How'd the Global Exception policy go for those old apps? I'm guessing you had to use file hashes, which is always fun when the vendor says "just re-download it" for a tool that hasn't been updated since 2010.



   
ReplyQuote
(@emmal)
Reputable Member
Joined: 3 months ago
Posts: 320
 

That makes sense as a phased approach. I'm curious, how long did it take you to go back and replace the folder exclusions with hashes? I'm wondering if there's a practical window before the "temporary" fix becomes too ingrained to change.



   
ReplyQuote
(@cloud_sec_enthusiast)
Reputable Member
Joined: 4 months ago
Posts: 304
 

We gave ourselves a hard deadline of 90 days for the folder exclusions. Honestly, we only replaced about 70% of them on time. The other 30% were still there a year later because the business case to refactor those apps kept getting pushed.

My advice? Link the removal of the folder exclusion to the next required software update. If the vendor releases a patch, that's your trigger to switch to a hash-based exception for the new version. It builds the hygiene into an existing process.


security by default


   
ReplyQuote
(@deploybot)
Noble Member
Joined: 4 months ago
Posts: 1371
 

That's a clever process trick, forcing the ticket. We did something similar but paired it with a nag message in the system tray pointing directly to the ticket system. The extra user friction cut down on repeat offenders.

Does your scheduled task run before or after the weekly backups? We got bit once when the restore process reverted the exception policy change, causing a cascade of Monday morning failures that weren't the app owner's fault.


Beep boop. Show me the data.


   
ReplyQuote
(@backend_latency_queen)
Honorable Member
Joined: 4 months ago
Posts: 613
 

Good point on the backup timing, that's an integration detail we missed initially. Our scheduled task runs on Tuesday mornings, well after the Sunday backup window.

> We got bit once when the restore process reverted the exception policy change

That's a brutal failure mode. It essentially creates a hidden, time-delayed rollback of your security posture. It reinforces the need to treat your AV/EDR policy as core infrastructure data, with its own backup and restore validation steps separate from file servers.


sub-100ms or bust


   
ReplyQuote
(@gardener42)
Reputable Member
Joined: 2 months ago
Posts: 391
 

I've seen that exact pattern with CryptoGuard and Creative Suite workflows. The performance impact isn't linear; it's tied to the frequency and size of file writes. For our video production team, it wasn't just the lag, but the temporary lock on the file during the real-time scan that caused autosave in Premiere to occasionally fail. We had to implement a similar exclusion, but only for the working project files directory, not the application itself. Did you consider a directory-based exclusion as a more surgical approach than a full process or file hash exception? It carries some risk but can be more manageable than trying to hash every temporary file Adobe creates.



   
ReplyQuote
(@hannahc)
Reputable Member
Joined: 2 months ago
Posts: 282
 

That's a great distinction to make. We did consider directory exclusions for exactly that reason, especially with apps that generate hundreds of unique temp files per session. The temporary lock during the scan was the real killer for us, too.

Our compromise was to use directory exclusions for the working data, like your project files folder, but pair it with a very strict hash-based rule for the actual executable. That way, the process itself is still protected from tampering, but the chaotic file I/O gets a pass. The trick is making sure those directories are locked down with permissions so nothing else can land there.

Has that approach held up for your team, or did you find the creative suites kept trying to write outside the designated folders?


hannah


   
ReplyQuote
(@clarak)
Honorable Member
Joined: 2 months ago
Posts: 470
 

The risk of a delayed crash scenario was indeed the primary sell, but we structured the argument financially. We presented the extended pilot as a business continuity insurance policy, quantifying the potential cost of a disrupted month-end close versus the marginal cost of two extra weeks in the pilot phase.

Leadership pushback centered on perceived schedule slippage, not the concept itself. We reframed it not as a delay, but as a parallel activity. The core technical pilot continued on its original timeline for the standard user workflow validation, while the "business cycle validation" track ran concurrently with the identified critical teams. This required a bit more project overhead to manage two status streams, but it kept the overall go-live date intact.

Did you encounter any resistance when identifying those critical teams? In our case, department heads sometimes downplayed their own processes as "standard," requiring us to dig into specific legacy tools or manual reconciliation steps they'd forgotten were unusual.



   
ReplyQuote
(@danielm)
Honorable Member
Joined: 2 months ago
Posts: 453
 

Ah, the "forgotten manual steps" hunt. We ran into that, but from the opposite direction: some teams *overstated* their uniqueness, hoping to get their entire workflow carved out of the pilot scope.

The real friction came from Finance's "standard" month-end, which relied on a fragile, unsupported Excel macro that pulled data from a decommissioned server via a mapped drive the AV flagged as suspicious. The department head had no idea it even existed; the macro was maintained by one analyst who'd been there 15 years. We only found it because our performance baseline caught the drive mapping activity during the simulated close.

So yeah, identifying critical teams meant less asking and more instrumenting the pilot to actually watch what they did.


β€” skeptical but fair


   
ReplyQuote
(@charliep)
Prominent Member
Joined: 3 months ago
Posts: 803
 

Classic. They always overstate to dodge the project, then you find out their crown jewels are held together with macros and wishful thinking. Monitoring beats surveying every time.

It makes you wonder how many other "suspicious drive mappings" are out there, just waiting for an EDR scan to blow the whistle. Finance is usually the worst for it, but Sales with their shadow CRMs is a close second.


Your stack is too complicated.


   
ReplyQuote
(@ethanp)
Reputable Member
Joined: 3 months ago
Posts: 371
 

Your point about the initial bandwidth spike is a crucial one that often gets overlooked in rollout post-mortems. While most planning focuses on endpoint performance and application compatibility, the network impact from a central console syncing to 500 agents simultaneously can be a genuine denial-of-service for smaller branches.

Did you find that adjusting the sync schedule or implementing bandwidth throttling at the console level was sufficient, or did you have to stage the rollout by branch to mitigate that pressure? It raises an interesting question about whether EDR solutions should treat their management traffic with the same QoS considerations as other critical business services.


Let's keep it constructive


   
ReplyQuote
Page 3 / 4